Saudi Carbon Monitoring provides LDAR programme support in Saudi Arabia, helping industrial facilities structure leak detection and repair as a controlled programme rather than a one-off survey. A leak survey becomes an LDAR programme only when detection leads to controlled action, so the programme needs defined equipment populations, inspection methods, leak criteria, repair ownership, recheck rules, exceptions, data controls and management review.
You receive a written proposal setting out the programme scope, delivery roles, deliverables, lead time and price. Request a quotation
Saudi Carbon Monitoring scopes, coordinates and manages the work; field surveys, technical review and repair are delivered by licensed or qualified parties named in each proposal. LDAR support does not replace the permit, approved method or regulatory decision that applies to your project.
Set the LDAR programme basis
The basis document explains why the programme exists: a Saudi permit or authority requirement, corporate environmental control, methane initiative, process-loss reduction, occupational concern or a combination. It identifies the governing documents, covered facilities and units, substances, component types, inspection frequency, leak definitions, delay-of-repair rules, record retention and responsible roles.
An accurate component register is central. Each component needs a durable identity linked to the process unit, equipment type, service, location and status. Field verification reconciles drawings with installed equipment and records items that are inaccessible, unsafe, out of service or newly installed. Change management keeps the register current after maintenance and modifications.

Detection must connect to repair
The survey method states instrument performance, calibration or function checks, environmental limitations, inspection technique, background treatment, documentation and escalation. Method 21 and optical gas imaging can serve different roles; neither is substituted without checking the applicable programme. Where OGI applies, the current US EPA Appendix K documents a US programme boundary and operating conditions, not a universal Saudi requirement or direct mass-rate method.
When a leak meets the defined criterion, the record creates an accountable repair action with priority, owner, target date and required evidence. The maintenance team needs enough location and equipment information to act safely. After repair, a recheck under the applicable method confirms the measured status. See Leak Repair Tracking and Verification for the close-out workflow.
Manage exceptions without hiding them
Not every leak can be repaired immediately. Shutdown needs, safety constraints, parts availability or process conditions may require an approved delay. The programme states who may approve that status, what justification and interim controls are needed, when the component will be rechecked and how overdue actions escalate. “Unable to repair” is not a complete record.
Dashboards can show components surveyed, leaks detected, repair timeliness, overdue rechecks, recurring equipment and estimated emissions where a defensible quantification method exists. They never turn missing coverage into a positive performance result. Environmental KPI design can help separate operational indicators from public claims.
Programme outputs
Outputs may include the programme basis, responsibility matrix, component-register specification, survey procedure, field forms, repair/recheck workflow, exception register, QA/QC plan, reporting definitions, training needs and management-review calendar. The client remains responsible for site access, process control, safe maintenance and timely decisions.
For scoping, provide facility location, process units, current register or drawings, component estimate, products and services, applicable permit or corporate rules, inspection history, leak thresholds, maintenance workflow, hazardous-area classification, data platform and performance goals. LDAR programme support is available for projects across Saudi Arabia, including Dammam, Jubail and Riyadh.
Implementation sequence for an operating facility
- Start with a pilot area that is large enough to test the register, field route, repair handover and data system but contained enough to correct problems quickly.
- Reconcile expected and actual component populations, review instrument checks and observe whether maintenance can locate each finding.
- Close the full detect–repair–recheck loop before scaling across units.
- Approve the naming convention, leak and exception codes, roles, survey calendar and management indicators.
- Train operations and maintenance as well as survey personnel; a field team cannot sustain the programme if equipment changes are never reported or repair records remain outside the system.
- Establish periodic register reconciliation and programme review.
For a multi-site client, preserve a common minimum standard while allowing site-specific hazardous-area, process and permit rules. A phased implementation provides evidence that the workflow works before it is scaled.
Frequently asked questions
Who provides LDAR programme support in Saudi Arabia?
Saudi Carbon Monitoring provides LDAR programme support in Saudi Arabia by structuring the programme, coordinating the field and technical parties and managing the register and records.
Is a one-time OGI survey an LDAR programme?
No. It may be a useful survey, but a programme also requires defined coverage, repair, recheck, exceptions, records and governance.
How do I set up LDAR support for my facility?
Start with the programme basis and a component register. The applicable programme determines identification requirements; the essential outcome is a durable, field-usable identity for every component, linked to a controlled register.
Who approves a delayed repair?
The facility defines an authorised role and criteria consistent with the applicable requirement. The decision and evidence remain auditable.
Can LDAR results support a GHG inventory?
Potentially, if the GHG practitioner accepts the quantification method, population coverage, time basis and uncertainty treatment.
What affects the cost of LDAR programme support?
Cost depends on the component population, facility and unit count, inspection frequency, method, hazardous-area requirements, and the register, repair-workflow and reporting deliverables.
How long does it take to set up an LDAR programme?
Timing depends on register readiness, pilot scope, number of units, site procedures and data-system needs. Lead time is confirmed in each quotation.
Saudi Carbon Monitoring serves projects across Saudi Arabia, including Dammam, Al Khobar, Jubail, Riyadh, Jeddah, NEOM and Qiddiya.
Request LDAR programme support in Saudi Arabia
Tell us your facility, process units and current register status, and we will scope LDAR programme support in Saudi Arabia. Request a quotation