This page sets out the emissions measurement delivery model of Saudi Carbon Monitoring in Saudi Arabia: we provide commercial scoping, equipment and selected measurement-led workstreams, and named qualified parties deliver the roles that need licences, accreditation or independence. Environmental measurement becomes valuable when responsibility is explicit, so the exact field team, laboratory, engineer, GHG accountant or verifier is identified in the proposal whenever that role is required.
You receive a written proposal setting out the scope, responsible parties, deliverables, exclusions and price. Request a quotation
Website content is not legal advice or authority approval; regulatory and legal interpretation rests with the relevant authority and adviser.
Emissions measurement delivery model: who is responsible
| Workstream | Typical responsible party | Boundary |
|---|---|---|
| Equipment selection and commercial coordination | Saudi Carbon Monitoring, with manufacturer input where relevant | Fit for purpose is confirmed through application review |
| Field measurement or source testing | Named competent testing party | Method, access, HSE, calibration and accreditation needs confirmed per project |
| Laboratory analysis | Named laboratory | Accreditation scope and chain of custody confirmed before sampling |
| Emissions or carbon-data preparation | Named data lead or GHG practitioner | Boundary, factors, assumptions and approvals documented |
| Engineering interpretation | Named discipline engineer | Design or reduction outcomes require an engineering appointment |
| GHG verification or assurance | Independent verifier | Must remain independent from the inventory-preparation role |
| Regulatory or legal interpretation | Relevant authority and adviser | Outside the scope of this website |
Conditional services
Pages about Scope 1, Scope 2, Scope 3, ESG data, decarbonisation baselines and verification readiness describe preparation and coordination. Where a project needs complete accounting, strategy or assurance, the proposal names the delivery party, the framework in use and the extent of reliance permitted.
What every proposal should say
A proposal should identify the facility or project boundary, sources and assets, reporting period, method or standard, data hierarchy, responsible personnel, field and laboratory roles, QA/QC, uncertainty treatment, deliverables, exclusions, schedule assumptions, safety/access requirements and document-control route. If results are intended for a regulator, lender, corporate inventory or public disclosure, that intended use must be stated before work starts.
Independence and reliance
Preparation and verification are different. We can help assemble activity data, reconcile records and prepare an evidence pack, but that work is not independent assurance of its own output. The verifier defines its own evidence needs and conclusion under the agreed assurance framework. Similarly, a field measurement does not certify an entire inventory unless the inventory practitioner has accepted its relevance and boundary.
Before you award work
Confirm in the proposal the legal entity, named partners, licences or accreditation scopes where applicable, personnel competence, methods, equipment, laboratory chain, engineering responsibility, verification independence and applicable Saudi requirements. Our own scope is the coordination and measurement-led preparation named in the proposal.
Review the relevant Emissions Measurement or Carbon Data workstream, then use Contact to define the facility, intended use and responsible delivery roles.
Frequently asked questions
Who provides emissions measurement and carbon data services in Saudi Arabia?
Saudi Carbon Monitoring provides the scoping, equipment and measurement-led preparation. Field testing, laboratory analysis, GHG accounting and independent verification are delivered by the named parties in your proposal.
How does the emissions measurement delivery model work on a project?
The proposal identifies each responsible party for the field team, laboratory, data preparation, engineering and verification roles, with the boundary of each role stated.
Can Saudi Carbon Monitoring verify my GHG inventory?
No. Independent verification is delivered by an independent verifier who remains separate from the preparation work. We can organise the evidence pack.
What should a proposal include?
The facility or project boundary, sources, reporting period, method or standard, responsible personnel, QA/QC, uncertainty treatment, deliverables, exclusions and schedule assumptions, plus the intended use of the results.
What affects the cost of a measurement project?
Cost depends on the roles required, the sources and methods in scope, field and laboratory needs and site access. Your quotation sets out the scope and price.
How long does a measurement project take?
Timing depends on the scope, the parties involved, site access and the reporting deadline. The schedule is set out in your quotation.
Saudi Carbon Monitoring serves projects across Saudi Arabia, including Dammam, Al Khobar, Jubail, Riyadh, Jeddah, NEOM and Qiddiya.
Request a quotation
For emissions measurement in Saudi Arabia with clearly defined responsibilities, tell us the facility, intended use and delivery roles you need, and we will prepare the scope and price. Request a quotation
